Commit Graph

16 Commits

Author SHA1 Message Date
12f33307fd feat(phase-28): add scoring system, operational metrics and executive dashboard (T-224 to T-226) 2026-02-09 17:24:44 +01:00
a911ddeb52 feat(phase-27): add advanced ATT&CK Navigator-style heatmap with layers, filters and export (T-221 to T-223) 2026-02-09 17:16:59 +01:00
57b47c296d feat(phase-26): add Campaign models, endpoints, service with kill chain timeline UI (T-217 to T-220) 2026-02-09 16:52:52 +01:00
f4de12d8ab feat(phase-25): add detection rule associations, checklist UI and evaluation workflow (T-215, T-216) 2026-02-09 16:44:35 +01:00
cd124b655b feat(phase-24): integrate MITRE D3FEND defensive techniques with ATT&CK mapping (T-213, T-214) 2026-02-09 16:38:59 +01:00
2fc0e2cafd feat(phase-23): add Threat Actor profiles with MITRE CTI import, API, heatmap and gap analysis (T-208 to T-212) 2026-02-09 16:27:38 +01:00
f4c8cbf768 feat(phase-22): add import services for Sigma, LOLBAS, GTFOBins, CALDERA, Elastic and data sources panel (T-203 to T-207) 2026-02-09 16:19:44 +01:00
9ea6ce1326 feat(phase-19): add remediation fields and reports system (T-130, T-131) 2026-02-09 13:58:35 +01:00
fb7f340038 feat(phase-18): add in-app notification system (T-128, T-129) 2026-02-09 13:52:04 +01:00
9d7832c571 feat(phase-12): implement Red/Blue API endpoints (T-109, T-110, T-111, T-112)
T-109: Rewrite tests router with full Red/Blue workflow endpoints - list with filters, create from template, Red/Blue team updates with state guards, start-execution, submit-red, submit-blue, validate-red, validate-blue, reopen, and timeline. All using workflow service from Phase 11.

T-110: Rewrite evidence router with Red/Blue separation - upload with team field, list with team filter, delete with state-based permissions. Red Team edits in draft/red_executing, Blue Team in blue_evaluating, admin bypasses all.

T-111: Create test_templates router with full CRUD - paginated list with source/platform/severity/search filters, by-technique lookup, admin-only create/update, and soft delete. Registered in main.py.

T-112: Add POST /system/import-atomic-tests endpoint to system router - admin-only trigger for Atomic Red Team import with error handling and statistics response.

Includes validation tests for all four tasks (35 checks total).
2026-02-09 10:45:33 +01:00
174919da4e feat(phase-9): implement MVP polishing and closure
T-032: User management admin panel - backend users router with CRUD, frontend UsersPage with modals

T-033: Audit log viewer - backend audit router with filters/pagination, frontend AuditLogPage

T-034: Global error handling - ErrorBoundary, LoadingSpinner, ErrorMessage, Toast components

T-035: Backend tests - pytest setup with SQLite, tests for health/auth/techniques/tests

T-036: Documentation - Updated README with testing section, created docs/API.md
2026-02-06 16:30:35 +01:00
abdb23be33 feat: Phase 5 - Metrics and dashboard API (T-020)
- Add GET /metrics/summary endpoint with global coverage counts and percentage
- Add GET /metrics/by-tactic endpoint with per-tactic coverage breakdown
- Handle multi-tactic techniques (comma-separated) counting in each tactic
- Add CoverageSummary and TacticCoverage Pydantic schemas
- Update README with metrics endpoints and project structure
2026-02-06 15:33:37 +01:00
b11854fdab feat: Phase 4 - MITRE ATT&CK sync and scheduled job (T-018, T-019)
- Add MITRE sync service via TAXII 2.0 with GitHub fallback
- Upsert attack-pattern objects into techniques table (691 techniques)
- Detect name/description changes and flag review_required on re-sync
- Add APScheduler background job running every 24h
- Add POST /system/sync-mitre endpoint (admin only)
- Add GET /system/scheduler-status endpoint (admin only)
- Configure logging for scheduler and sync visibility
- Update README with new endpoints and project structure
2026-02-06 15:28:53 +01:00
4f6dd838fd feat: Phase 3 - CRUD core for Techniques, Tests and Evidence (T-014 to T-017)
- Add Pydantic schemas for Technique, Test and Evidence
- Add CRUD endpoints for Techniques (list with filters, detail, create, update, review)
- Add CRUD endpoints for Tests (create, detail, update, validate, reject)
- Add evidence upload with SHA-256 integrity and presigned download URLs
- Add MinIO/S3 storage client with bucket auto-creation on startup
- Add status_service to recalculate technique coverage from test results
- Add require_any_role RBAC dependency for multi-role authorization
- Update README with API endpoints reference and project structure
2026-02-06 13:52:27 +01:00
508f0723af feat: Phase 2 - Authentication and authorization (T-010 to T-013) 2026-02-06 13:15:25 +01:00
b479acdea0 feat: Phase 0 - Infrastructure and scaffolding (T-001 to T-003)
This commit establishes the foundational infrastructure for the Aegis
MITRE ATT&CK Coverage Platform.

T-001: Initialize project and Docker Compose
- Set up Docker Compose with PostgreSQL 15, MinIO, and FastAPI backend
- Create basic FastAPI application with health endpoint
- Configure persistent volumes for data storage

T-002: Configuration and database connection
- Add centralized configuration using pydantic-settings
- Implement SQLAlchemy database connection with session management
- Configure MinIO and JWT settings

T-003: Initialize Alembic for migrations
- Set up Alembic with PostgreSQL connection from settings
- Create initial empty migration
- Configure autogenerate support for future models

Also includes:
- Professional README with setup instructions
- Comprehensive .gitignore for Python/Node/Docker
- Project task plan (AegisTestPlan.md)
2026-02-06 11:28:30 +01:00